The estimate runs four pages, and the last page adds a line called O&P.
That line is somebody’s markup for running the job, not a price for anything you can point at. O&P stands for overhead and profit: a percentage a general contractor adds on top of the work listed above it. It works the same on a Long Beach estimate as on any other. The numbers underneath it do not, and those are the ones you can check.
What does O&P mean on my estimate?
Look near the bottom. It is usually the second-to-last line, under the subtotal and above the tax, written as a bare percentage with nothing beside it to explain itself.
Overhead is what it costs to keep a company running on the days your job does not exist. The office, the truck payment, the phone somebody picks up at four in the morning, the hour an estimator spent in your hallway with a tape measure. Profit is whatever survives once all of that is paid. Neither one is hidden money. It just does not attach to any single line the way a sheet of drywall does.
The old habit in the trade is ten percent for each, which is where you will hear people say ten and ten.
Nothing in California law sets that number, and no regulation names a percentage. What actually moves it on a real file is duller than the argument people have about it: which estimating program the insurance company writes in, and whether somebody has already dropped a scope into the file. A scope is just the itemized list of what gets done and by whom.
When should O&P be on my estimate, and when shouldn't it?
Traditionally it rides on a job that needs several trades put in order, a plumber and then a drywall hanger and then a painter and then the flooring installer, and traditionally it rides on nothing when one trade does the whole job, because there is nobody to put in order.
That ordering is the thing being sold. Somebody keeps the painter from turning up in a room the hanger has not finished. Somebody holds the week together on the morning the flooring installer does not turn up at all.
Does the number of trades actually settle it?
No. Two trades and a week of work is the muddy middle where two honest estimators write two different numbers, and nobody has published a line that resolves it. If a person tells you the rule is three trades, that is a habit being repeated, not a rule being cited.
What your own insurance company will do with the line is not something a stranger can tell you. Page one of your policy can. The declarations page, the summary sheet at the front, says whether you are on replacement cost or actual cash value, which means whether the policy pays what the work costs to redo or what the old materials were worth after their years of wear. That is what decides whether the O&P shows up in the first check or only after the work is finished, and it is why the first check comes in smaller than the estimate. Read that page before you call anybody.
Why does it feel like I'm being charged twice?
Because you had already read the subtotal as the price. Then a percentage landed on top of a number you had accepted, and nobody walked you through it.
Here is the part that sounds worse than it is. Every unit price on the estimate, meaning each per-item number the whole document is built out of, already covers the cost of doing that particular work and already leaves something for whoever does it. The square-foot number for hanging and finishing drywall pays the hanger’s wage and the gas in the truck he drove to your street. Our hourly rate covers the technician’s payroll tax. O&P is laid over all of it and pays a different party for a different thing: running the job instead of performing it.
So the question worth holding onto is whether anybody is genuinely running this job, and whether that is the same company already billing you for the labor. When the drying crew and the repair contractor are one company, the runner and the doer are on one payroll.
Does O&P apply to the emergency cleanup part of the bill?
Usually not. The emergency half of the work, the drying and the cleanup, frequently carries no O&P line at all. It gets billed as hours, as days of equipment sitting on your floor, as the antimicrobial sprayed on before the fans go in, as the dump fee. An hourly rate has no subtotal beneath it for a percentage to sit on.
It gets muddy when one company dries the house, writes the repair estimate too, and both land inside the same document. Ask which lines the percentage was applied to. On a combined estimate you should be able to see that for yourself without anybody talking you through it.
What should I ask about the O&P line?
Five questions, and they fit in one email.
- Which subtotal the percentage was applied to, and whether the drying and cleanup lines got folded into it.
- Who is doing the coordinating that the markup pays for, and whether that is the same company already billing for the labor.
- Replacement cost side or depreciated side.
- A copy of every document the settlement was based on.
- Whether the unit prices were checked against Long Beach pricing.
The last two are not favors you are asking for. California’s claims regulations, 10 CCR 2695.9(d) if you want a number to put in the email, say that where a settlement is built on a written estimate the insurance company prepared or paid for, it has to give you a copy of every document that settlement rests on, and it has to take reasonable steps to verify that the repair costs it used are accurate for the local market area. Long Beach is your local market area. That is the phrase to use.
Ask in writing, not on the phone. The answer to the first question is the one you will want in front of you if the number is ever argued.
My contractor's estimate has O&P and the insurance company's does not. What happens?
You are not stuck here, and you are not owed a fight either. Where your own written estimate comes in higher than theirs, that same regulation leaves the insurance company three ways forward and it has to pick one: pay the difference between the two estimates, name at least one contractor who will do the work for the amount of its estimate, or adjust your contractor’s written estimate and hand you a copy of the adjusted version.
That tells you what happens next. It does not tell you who is right. Ask which of the three you are getting, and ask for it in writing.
What you can do is make the gap legible. Set the two estimates side by side and read them line for line, item against item. Totals tell you nothing.
If the argument turns out to be about the whole number and not the last line, what restoration work costs in Long Beach takes the rest of the invoice apart, line type by line type. The other questions that land on top of that same estimate are answered across the rest of the paperwork guides.
Pipe burst? What to do in the first hour
Is Mold Testing Worth It, or Is It a Scam?
Smoke Damage When the Fire Was Next Door
If you are at a kitchen table in Long Beach with an estimate in front of you and a line you cannot account for, (657) 660-4185 is answered at any hour.